Monday 7 October 2019

Activity Excel Utility Using P6 EPPM Web Services



P6 EPPM Web Services is a great way of integrating external systems with P6 EPPM application. Activity excel utility allows reading and writing data to Oracle Primavera P6 EPPM using P6 EPPM Web Services.
Activity excel utility allow user to
  • Maintain activity details
  • Maintain activity relationship
  • Assign global and project activity code to activity
  • Assign resource or role to activity
  • Maintain activity steps
  • Maintain activity UDF
  • Maintain resource assignment UDF
  • Maintain activity step UDF

  


Update Project List – download list of projects from the connected P6 EPPM application
Read All Data - allows downloading all activity data at the click of button.
Clear All Data - removes data from all worksheets
Read – Read or download data from P6 EPPM using Web Services
Modify – Create, Update or Delete the data for the corresponding business object

Screenshots of some of the worksheet are shown here for reference.
Activity Details allows creating new activity and maintaining existing activity data. CRUD flag is used to identify the operation to be performed.
“C” – Create, “U” – Update, “D” – Delete, “R” – Read.
Activity data is downloaded with CRUD flag as “R”. 


Activity attributes like Duration Type, % Complete Type, etc. use same set of values as in the application

Duration Type
Fixed Units/Time
Fixed Duration and Units/Time
Fixed Units
Fixed Duration and Units
Percent Complete Type
Physical
Duration
Units
Activity Type
Task Dependent
Resource Dependent
Level of Effort
Start Milestone
Finish Milestone
WBS Summary
Primary Constraint Type
Start On
Start On or Before
Start On or After
Finish On
Finish On or Before
Finish On or After
As Late As Possible
Mandatory Start
Mandatory Finish

Activity Relationship can be created and updated within excel utility. Relationship Type has a predefined set of values as used in application - Task Dependent, Resource Dependent, Level of Effort, Start Milestone, Finish Milestone, WBS Summary

Activity Code Assignment allow user to assign activity code to activities. Both global and project specific activity codes can be assigned to activities.  

Resource Assignment allow user to assign resource/role to activities. This can be used to maintain resource assignment for activities of the project.

User interface for all other worksheets are similar to the one shown above.
Download evaluation copy hereDrop me a message, if you are unable to download the evaluation copy.

No comments:

Post a Comment

About Me

My photo
Over 20 years of experience in providing integration software solutions to various industries.Handled numerous projects implementing Primavera P6 EPPM, P6 Analytics, P6 BI Publisher Reports, Oracle BPM, SOA Suite, Primavera Gateway, Oracle Unifier, Instantis EnterpriseTrack, Oracle E-Business Suite.

Developed integration solution around these products and with ERP and legacy systems.

Designed excel utilities to quickly load and maintain data in excel for these products.

Connect with me on LinkedIn

Popular Posts

Contact Form

Name

Email *

Message *